Telford foundry

Case studies

Overview of our case studies
Our solutions were used in many noteworthy projects and installations across the country. You can filter them through market sector below.

Pages

Garda project
Soil, drain & rainwater
Ensign Soil specified with our BIM capabilities creating significant value.
natural pipe
Water
Soil survey to delivery in less than 1 week
natural pipe
Water
Station Road Hook is a 350mm Natural pipe scheme being installed by Clancy Docwra.
opt-emax
Municipal castings
Supply chain collaboration between MWay Communications, Saint-Gobain PAM UK and Stanton Bonna has led to an access cover installation solution that reduces time on site by 50 percent, improves site safety and ensures factory controlled quality standards are met for reduced future maintenance.

Pages